Page 59 - BSR17-EN
P. 59
Company Investment Objective
Borusan Draught Hole Preventing the inappropriate excess
Mannesmann Value Flow intermediate stockpile in the footpaths
Halkalı Factory Mapping outside the designated pipe storage areas
and also walk ways, as a result of the
instantaneous excessive production due to
the capacity differences between processes.
Targeted Gains Economic: Reduction in the material delivery time related
productivity loss thanks to the improved line balancing
Social: Elimination of quality and work safety risks arising from
intermediate stockpile problem.
Company Investment Objective
Borusan Machinery Sourcing same quality spare parts from local
Mannesmann Spare Parts suppliers cheaper and faster
Gemlik Spiral Localization
Pipe Factory Project
Results Economic: At the end of 12-month validation period we have
reached to 110,000 US Dollars revenue, while having obtained
materials in so much shorter lead times compared to imported
materials.
Social: We have begun to work with new and local suppliers.
Company Investment Objective
Borusan Reducing the Spotting and consuming slow moving,
Mannesmann slow-moving hidden and unidentified raw material in the
Gemlik ERW inventory stock.
Factory turnover
process
Targeted Gains Economic: 96,000 US Dollars a year revenue increase
Social: Reduction of inventory stock thereby reducing work
health and safety risks during related inventory moves
Corporate: Carrying out list preparation process in digital
domain.
59