Page 114 - BSR17-EN
P. 114
Borçelik Steam Cost Reduction
We implemented practices with 150 thousand US Dollars bud-
get to reduce steam cost by 10% and reduce production cost
at auxiliary facilities. We aim to save 100 thousand US Dollars
annually and prevent 838 tons of CO e emissions.
2
Borçelik CGL3
Reducing Energy Consumption
We targeted 6% reduction in energy consumption and reduce production
costs by practices such as; applying driver to hydraulic engine entry and
exit, LED transformation of projectors in the line and turning off unnec-
essary during equipment during maintenance time. After two months of
validation, we achieved 11% energy saving and prevented 513 tons of
CO e emission.
2
Borusan Mannesmann Gemlik ERW
Boron Oil Station Power Consumption
Reduction Project
We targeted a 75% improvement
in power consumption at ERW
plant boron oil station by adding
a 0.5 bar capacity blower instead
of 6 bar pressurized air. After im-
plementation, we saved 1,249,097
kWh/year energy and 312 thou-
sand TL accordingly. OHS risk de-
creased due to bar reduction. Our
annual greenhouse gas emissions
dropped to 618 tons of CO e. We
2
implemented the practice in all bo-
ron oil stations.
114