Continuing Energy Management


            Projects Started Before

            The Reporting Period












            Project to Reduce Energy Consumption


            at Borçelik





                               As a result of cost reduction and energy consumption reduction in un/
                               planned stoppage of the RCM – reversible cold mill lines we save 130
                               thousand  dollars  annually  and  prevent  approximately  715  tons  CO e
                                                                                                           2
                               emissions.





            LED Lighting Automation


            at Borçelik






                               LED fitting transition is done at three halls of Borçelik production line.
                               The return on investment duration was 9.6 months. We achieve a total of
                               45,700 kWh energy savings at these three lines monthly.






            Reducing Natural Gas Consumption at


            Borçelik Regeneration Plant




                               As a result of the improvement project to avoid failures and unplanned

                               stoppages at hydrochloric acid regeneration plant which increase natural
                               gas consumption, we started saving 200 thousand dollars and additional-
                               ly prevent 1,372  tons CO e emission annually.
                                                          2