Page 113 - BSR17-EN
P. 113
Continuing Energy Management
Projects Started Before
The Reporting Period
Project to Reduce Energy Consumption
at Borçelik
As a result of cost reduction and energy consumption reduction in un/
planned stoppage of the RCM – reversible cold mill lines we save 130
thousand dollars annually and prevent approximately 715 tons CO e
2
emissions.
LED Lighting Automation
at Borçelik
LED fitting transition is done at three halls of Borçelik production line.
The return on investment duration was 9.6 months. We achieve a total of
45,700 kWh energy savings at these three lines monthly.
Reducing Natural Gas Consumption at
Borçelik Regeneration Plant
As a result of the improvement project to avoid failures and unplanned
stoppages at hydrochloric acid regeneration plant which increase natural
gas consumption, we started saving 200 thousand dollars and additional-
ly prevent 1,372 tons CO e emission annually.
2
113