 Renewable Energy

 Generation Investments



 The total installed capacity of Borusan EnBW Enerji where the portfolio is totally based

 on renewable energy resources, reached 388.6 MW by the end of 2016. During 2016,
 Fuat  WPP,  Mut  WPP,  Koru  WPP  and  Harmanlık  WPP  completed  ISO  14001  and

 OHSAS 18001 procedures and obtained their certifications.



 Bandırma Wind Power Plant (89.7 MW)
 Yedigöl-Aksu Hydroelectric Power Plant (50.3 MW)

 Balabanlı Wind Power Plant (50.6 MW)
 Koru Wind Power Plant (52.8 MW)  Borusan EnBW Enerji

 Mut Wind Power Plant (52.8 MW)  2016 Renewable Energy Generation Investments
 Harmanlık Wind Power Plant (52.8 MW)

 Fuatres Wind Power Plant (19.8)   INVESTMENT  TIMING                       INSTALLED           BUDGET
                                                                            CAPACITY
 Dayıcık Solar Power Plant (6.6 MWp)

 Fuatres Wind Power Plant 2nd Phase (13.2 MW)  Dayıcık SPP (Solar   Start: March 15, 2016  6,6 MWp  $ 9 Million
              Power Plant)                 Commissioning of plants:
              Mut / Mersin                 July 27, 2016

              Preliminary      During the construction stage; all demands, complaints, suggestions
 GAINS TARGETED WITH   work done   and questions are received from the stakeholders such as local
 THESE INVESTMENTS ARE TO  before the   community, local authorities and government authorities within
              investment:      the scope of the Grievance system which functions as the Project/
                               Plant Communication Mechanism. Upon the demands received, we
 > Increase diversity of energy resources in Borusan EnBW Enerji portfolio and contrib-  supported Dayıcık Village Primary School and students in various ways.
 ute to the creation of a balanced portfolio,
              INVESTMENT                     TIMING                             INSTALLED  BUDGET
                                                                                CAPACITY
 > Contribute in the environmental conservation by investing in solar and wind power

 that produce zero carbon and no waste,  Fuatres WPP (Wind Power  Investment decision: July 2013 13,2 MWm  -
              Plant) 2nd Phase               Commissioning of plantsı:
              Kemalpaşa / İzmir              November 6, 2016
 > Contribute directly to Turkey’s 2023 policy to meet 30% of country’s energy need   Preliminary   Necessary legal permit procedures for the realization of investment
 from renewable resources, and increase wind power installed capacity to 10,000 MW   work done   were followed by Gold Standard Carbon Certification procedure

 in 2019 and 20,000 MW in 2023,  before the   conducted along with Environmental and Social Impact Assessment
              investment:       procedure. The public announcement meeting and the survey and
                                focus group works conducted afterwards were carried out in line with
 > Contribute in decreasing Turkey’s foreign trade deficit by reducing energy import   international norms. By operationalizing Fuatres, the power of 30,000
 through the use of domestic, renewable resources.  homes will be met from renewable resources annually.






 60                                                                                                                  61