The total installed capacity of Borusan EnBW Enerji where the portfolio is totally based
on renewable energy resources, reached 388.6 MW by the end of 2016. During 2016,
Fuat WPP, Mut WPP, Koru WPP and Harmanlık WPP completed ISO 14001 and
OHSAS 18001 procedures and obtained their certifications.
Bandırma Wind Power Plant (89.7 MW)
Yedigöl-Aksu Hydroelectric Power Plant (50.3 MW)
Balabanlı Wind Power Plant (50.6 MW)
Koru Wind Power Plant (52.8 MW) Borusan EnBW Enerji
Mut Wind Power Plant (52.8 MW) 2016 Renewable Energy Generation Investments
Harmanlık Wind Power Plant (52.8 MW)
Fuatres Wind Power Plant (19.8) INVESTMENT TIMING INSTALLED BUDGET
CAPACITY
Dayıcık Solar Power Plant (6.6 MWp)
Fuatres Wind Power Plant 2nd Phase (13.2 MW) Dayıcık SPP (Solar Start: March 15, 2016 6,6 MWp $ 9 Million
Power Plant) Commissioning of plants:
Mut / Mersin July 27, 2016
Preliminary During the construction stage; all demands, complaints, suggestions
GAINS TARGETED WITH work done and questions are received from the stakeholders such as local
THESE INVESTMENTS ARE TO before the community, local authorities and government authorities within
investment: the scope of the Grievance system which functions as the Project/
Plant Communication Mechanism. Upon the demands received, we
> Increase diversity of energy resources in Borusan EnBW Enerji portfolio and contrib- supported Dayıcık Village Primary School and students in various ways.
ute to the creation of a balanced portfolio,
INVESTMENT TIMING INSTALLED BUDGET
CAPACITY
> Contribute in the environmental conservation by investing in solar and wind power
that produce zero carbon and no waste, Fuatres WPP (Wind Power Investment decision: July 2013 13,2 MWm -
Plant) 2nd Phase Commissioning of plantsı:
Kemalpaşa / İzmir November 6, 2016
> Contribute directly to Turkey’s 2023 policy to meet 30% of country’s energy need Preliminary Necessary legal permit procedures for the realization of investment
from renewable resources, and increase wind power installed capacity to 10,000 MW work done were followed by Gold Standard Carbon Certification procedure
in 2019 and 20,000 MW in 2023, before the conducted along with Environmental and Social Impact Assessment
investment: procedure. The public announcement meeting and the survey and
focus group works conducted afterwards were carried out in line with
> Contribute in decreasing Turkey’s foreign trade deficit by reducing energy import international norms. By operationalizing Fuatres, the power of 30,000
through the use of domestic, renewable resources. homes will be met from renewable resources annually.
60 61
60