Borusan EnBW Enerji
2017 Renewable Energy Generation Investments
Balabanlı WPP Capacity
Enhancement Project
Teki̇rdağ
Leading aspects of investment:
The three wind turbines which System to be tracked by Borusan
are top-notch technology prod- EnBW where any social stakehold-
ucts without gear box built with er can submit enquiries and com-
130 meters wing diameter and 3.6 plaints.
megawatts electric power are the
largest and powerful ever built in Because the plant was amongst
Turkey then. farm fields, we utilized existing
roads and obeyed the farm bor-
Turbine towers were built in Turkey. ders while opening new roads.
We planned the plant investment
suitable for ecological environ- We paid attention to utilize local
ment. We took into consideration subcontractors during and after
the concerns of social stakehold- the investment and by creating
ers during planning and construc- employment in the region, we con-
tion stages. tributed to local economies.
In order to prevent possible in- Only the capacity enhancement
conveniences during construction project of Balabanlı WPP meets
work, we established Grievance the annual electrical power need
of 12,500 households and in the
meantime, we prevent 19 tons/
year carbon emission. The amount
Timing of carbon emission we prevent
Start date: May 2016 creates an equal impact that 500
Completion date: February 2017 thousand trees do.
Impacts before, during and after
Installed Capacity
investment on natural life have
3.6 MW
been tracked by authorized ex-
perts and no damage is reported.