[ENVIRONMENTAL PERFORMANCE]
Borusan EnBW Enerji
WASTE MANAGEMENT Construction Phase
Waste Management
— As Borusan Group which involves the leading
companies of steel, dealership, logistics and
energy industries, we act with the responsibility
to protect the environment where we work and
live in. —
We intend to minimize the negative environmental impacts of our companies’ operational
processes from product and service design and production to delivery and marketing
phases. We extend the scope of practices that involve processes such as reduction
of natural resource usage including water consumption and prevention of waste at its
source.
Borçelik
Improving Process of
Degreasing from Waste Oil Water For minimizing environmental impacts against leakage and eruption risks, neces-
and effectively monitoring environmental sary equipment is supplied, and on-going
A need for an improvement in the degreasing process processes during Kartaldağı Wind Power matters are conveyed to operation team to
of the contaminated waste water arose due to the in- Plant construction that was started in June ensure the process is seamlessly carried
creases in the waste oil water ratio and the cost of the 2016, work led by Investments and HSE out in the future. Besides, waste during the
chemicals in the treatment unit. Emulsion process was (Health, Safety, Environment) Departments construction stage to be disposed without
revised through a Project by Auxiliary Units with a 3,500 has commenced. harming the environment, hazardous waste
TL investment. The inputs were standardised through to be carried away from the site by regis-
measurable data, thereby maintaining the same quality Within the framework of Kartaldağı WPP tered companies, and recyclable waste
of emulsion in each operation. This increased the emul- project, for preserving soil and natural re- to be handed to licenced companies are
sion volume, and reduced monthly emulsion numbers. sources; intervention plans are made managed.
RESULTS AND GAINS RESULTS AND GAINS
The employee motivation increased thanks to the reduction of the workload. The efficiency Besides creating awareness of environmental protection both in the investment team and
in waste oil increased, the use of chemicals decreased. The cost of chemicals is reduced by the teams of contractors and subcontractors, contribution is achieved in compliance with
about 40%. The return of the 5 months following the Project was USD 2,800. environmental procedures and preserving national values.